Your Planning Checklist
Scope the project
- Decide what you want and
need. (What’s a must and what’s a bonus?)
- Are there any special
requirements associated with your site, such as a need for earthworks or
heritage restrictions? (This information is available from your council.)
- How involved do you want to
be? (For example, do you have the time and expertise to be a hands-on
project manager?)
Organise your finances
- What is your total budget?
- Arrange finance if required.
Complete the design
- Decide your design needs - do
you want an architect, draftsperson or designer/builder?
(FromNovember 2010, for some work, your designer will need to be licensed.)
- Appoint the designer and
confirm the contract.
- Brief the designer and ensure
they understand the budget.
- Agree on concept drawings.
- Optional - get a PIM.
- Go through the design in
great detail. How will you use the space? What will it look like? Will
there be enough light? Once your consent is issued, it is costly and
time-consuming if you change your mind. Variations from the consented
plans may lead to problems getting the work signed off.
- Confirm the final plans.
Arrange project management
- Decide who will manage the
project. It could be your architect, designer, builder or a professional
project manager. If you wish to manage it yourself, be aware that it is
likely to be a major responsibility.
- Confirm the project
management contract if project management is not covered in your design or
building contracts.
Project manager arranges the builder and other tradespeople
- Decide what kind of building
contract you want. Typically, there’s labour only (the builder supplies
the labour, the project manager supplies everything else), managed
contract (the builder manages the project and the subtrades such as
plumbers and plasterers, but doesn’t supply the materials) and full
contract (the builder manages everything).
- Optional - get a quantity
surveyor to confirm how much of each material is needed, based on your
plans, and provide a cost estimate.
- Approach a shortlist of
builders and ask for tenders and quotes, based on the project plans and/or
the quantity surveyor’s report. Make sure they can work within your
timeframe.
- Choose a builder.
- Follow the same process to
engage subcontractors if required.
- Get a written contract with
your builder, including details of guarantees, payment schedules and
completion dates. Because the Act requires that builders use new materials
unless otherwise specified, your contract will also need to specify
whether any recycled materials are to be used.
Review your plans and budget
- Review the plans and budget.
If you need to alter your plans to reduce costs, do it now before you
apply for your building consent. If you don’t, and you want to make
variations later, you will need to apply for the consent to be amended
first and this will involve a fee and a time delay for your project.
Get a building consent and any resource consents
- If you didn’t get a PIM,
confirm with yourcouncil what consents and permits will be needed.
- Ensure your building consent
application has all the required documentation to show compliance with the
Building Code, and pay the fee.
- Apply for a resource consent
and any other permits, if required.
Begin construction
- Monitor progress.
- Pay bills as milestones are
met.
- Organise inspections and
ensure they are occurring as required. Typical inspections will include:
- foundations
- framing
- insulation
- plumbing
- drainage
- cladding and flashings
- finished building.
- Collect energy work
certificates for electrical and gas work as it is finished.
- Ensure the building is
progressing in accordance with the plans and the building consent is
amended if changes are made.
Complete your project
- Ensure everything has been
done as per the contracts and the plans.
- Ensure all fees to the
building consent authority and/or council have been paid.
- Apply for a code compliance
certificate from your building consent authority. Make final payment to
your project manager and builder, if this is specified in your contract.
|
|
|

|
|
|
|
|